Werrington Peterborough Sewer Connection
Sewer connection for 8 houses at Werrington in Peterborough.
A depth of 2.8 meters – using 6″ clay pipe.
We planned to have it completed in 5 days, 45 meters in the highway. I was a bit of an optimist. It took 7 days!